Recommendation Ship Tracker Container Tracker Ports Information Exclusive Research Enterprise Show Research Institute

Giant wind turbine on Maasvlakte

share to: Origin: Port of Rotterdam    Date: Nov 22, 2019

Huge 107-metre-long blades have recently started rotating on Maasvlakte. These are part of the Haliade-X12 MW, the world’s most powerful wind turbine. It is 260 metres high and has a 12-megawatt capacity, sufficient to generate energy to supply electricity to some 16,000 households in the region. As comparison: the wind turbine next to Van Brienenoordbrug has a maximum 3-megawatt capacity.

Ideal test location

Sif Netherlands is building the foundations for offshore wind farms on the 62-hectare site on Pieter van Vollenhovenweg. And it recently also started to be a test location for the Haliade-X.

The wind turbine is ultimately intended for a location at sea. Maasvlakte is located some distance from residential districts, close to the sea, has comparable wind conditions to the sea and is easily accessible. GE is also able to sell the generated electricity easily. This makes it the ideal test location. It was vital that the Haliade-X prototype could be launched quickly so we could stay ahead of the competition.

— Nathalie Bourges, GE Renewable Energy

Future Wind

The wind turbine will be tested extensively over five years to enable an assessment of wind turbine performance and operational procedures. Sif and Pondera (sustainable energy advice agency) have established the ‘Future Wind’ joint venture for this. GE Renewable Energy has signed an agreement for five years of testing and fifteen years of service and maintenance.

Innovation cross pollination

The arrival of Haliade-X at Maasvlakte fits entirely within Rotterdam’s aim to become a leader in sustainable energy. To achieve this, the Port Authority is stimulating initiatives that result in a ‘smart’ and ‘clean’ port – and connects parties together where innovative cross pollination is possible. As in the case of Sif and GE. ‘The first contact was made via the Port Authority,’ explained Diederik de Bruin from Sif. ‘They told us about the GE plans and connected us together.’

In production by 2021

The project fitted entirely within Sif’s aim for CO2-neutral production. ‘We are using a large proportion of the generated wind energy to supply our product locations in Roermond and Rotterdam with electricity. We are also supporting GE where necessary and making the space available.’ The end goal of the test phase is the certification of the wind turbine, so that the turbine can be taken into mass production. The first types of these wind turbines should be delivered by the second half of 2021.


Keywords:Port of Rotterdam Label:Port of Rotterdam

Previous: Ports of Los Angeles and Copenhagen Malmö sign five-year deal

Next post: Atlantic Container Line and Peel Ports ink 15-year contract extension

Disclaimer:All the texts and pictures of the manuscripts with the source of “China Port Network” and “www.chinaports.com” are copyrighted by the China Port Network. If reprinted and used, it must also indicate the source of the manuscript and the author's information, and bear the corresponding legal responsibilities.
0comments
This article represents only the author's own point of view and has nothing to do with the site.